Carpet
in the Hotel and Water in the Park
Gallery 7- October 18th & 25th, 2002
|
We're
getting close now! The framing and drywall are finished throughout the
hotel and upper floors are already painted and have furniture. The first
floor is the least complete so to walk in the hotel it is a bit deceiving
but this last aesthetic step of the construction process is the fastest.
There are some neat shots of the spiral staircase that leads up to the
main lobby as well as some exteriors of the building and the newly paved
parking lots. Perhaps most exciting though was our surprise in finding
water in the Waterpark. The thick layer of dust is gone and a skim coat
of colored pavement is covering much of the floors. Some of the pools
are full of water as they test them for leaks and we're sure proper operation.
Artists were busy at work creating fun wall decorations as well as some
really great river scene murals. Watch for the Hotel and Waterpark to
open on December 6th.
|
|